⚡
Amprove
Amprove
Pull to refresh

Good morning

Here's what's happening today.

Certs This Month
0
Boards Scanned
0
Quotes Sent
0
Revenue This Month
£0
Copper Price
-- /kg
Saved Jobs
0
Recent Certificates
No certificates yet
Weather
--
Loading...
Reg of the Day
Revenue Snapshot
This Week
£0
This Month
£0
Invoices
0
To Send
0
Outstanding
0
Paid
Active Work

No jobs yet — scan a board to get started

Team

Share test results, scans, and data with your team.

No team yet

Create a team or join one with an invite code.

A
V
%
Ω
Measured Ze, or DNO maximum: TN-C-S 0.35 Ω, TN-S 0.80 Ω. Always measure on site where possible.

⚡ Earthing & Bonding Calculator

Calculate main earthing conductor, main protective bonding, and supplementary bonding sizes per BS 7671.

Main Earthing Conductor (544.1.1)

Supplementary Bonding (415.2)

BS 7671 References:
• Main earthing: Table 54.7
• PME: Minimum 10mm² copper
• Main bonding: ≥ half main earth (min 6mm²)
• Supp bonding: ≥ half smallest circuit (min 4mm²)

📊 Load Calculator with Diversity

Calculate total demand with diversity factors per BS 7671 Appendix A. Essential for main switch sizing and supply calculations.

Domestic Loads

Diversity: 66% of total
First circuit: 100%, others: 40%
First 10A + 30% remainder + 5A if socket
Diversity: 100% (no reduction)
Diversity: 100% (no reduction)
Diversity: 100% (no reduction)
Diversity: 100% (critical load)

📋 BS 7671 Diversity Factors:
• Lighting: 66% of total
• Sockets: 100% first + 40% others (min 10A)
• Cooker: 10A + 30% remainder + 5A socket
• Water heater/Shower: 100%
• This gives realistic supply requirements

💡 Lighting Design Calculator

Calculate required lux levels, number of fittings, and spacing for professional lighting installations.

Room Dimensions

Desk height: 0.75-0.85m, Floor: 0m

Required Illuminance

Recommended: 500 lux for Office
Common Lux Levels:
• Office: 300-500 lux
• Retail: 300-750 lux
• Warehouse: 150-300 lux
• Classroom: 300-500 lux
• Kitchen: 500-750 lux
• Corridor: 100-150 lux

Fitting Specifications

29,000 lm (145 lm/W)
Clean: 0.8, Average: 0.7, Dirty: 0.6
Used with Room Index to calculate the utilisation factor.
Auto: derived from Room Index + finish. Untick to enter your own UF.
Fittings already installed that will remain
For warehouses with different fixture types per area

💡 Lighting Design Formula:
• E (lux) = (Φ × UF × MF) / A
• Φ = Total lumens, A = Area (m²)
• UF = Utilization factor (room reflectance)
• MF = Maintenance factor (lamp degradation)
• Spacing: Max 1.5× mounting height for uniform lighting

Quick Reference - Common Fittings

LED Panel 600×600:
• 40W: ~4000 lumens
• 50W: ~5000 lumens
• Typical office/retail use
LED High Bay:
• 100W: ~13,000 lumens
• 150W: ~19,500 lumens
• Warehouse/industrial (6-12m height)
LED Downlight:
• 12W: ~1000 lumens
• 18W: ~1500 lumens
• Residential/hospitality

🚨 Emergency Lighting Calculator

BS 5266 & BS EN 1838 compliant emergency lighting calculations for escape routes, open areas, and high-risk task areas.

Emergency Lighting Requirements

Corridor width or open area dimensions

📋 BS 5266 Requirements:

Minimum illuminance: 1 lux
Uniformity ratio: 40:1 max
Duration required: 3 hours

Emergency Fitting Specification

Emergency mode wattage (typically 2-5W LED)
Wide: 90-120°, Spot: 30-60°

🚨 BS 5266-1 & BS EN 1838 Key Requirements:
Escape Routes: Min 1 lux on centre line, 0.5 lux anywhere, 40:1 uniformity
Open Areas: Min 0.5 lux throughout, 40:1 uniformity
High Risk: Min 10% of normal lighting, min 15 lux
Duration: Min 3 hours (1 hour for sleeping accommodation)
Testing: Monthly flash test, annual 3-hour duration test

Emergency Lighting Quick Guide

Mandatory Locations:
• All escape routes and exits
• Changes in level (stairs, ramps)
• Each intersection/turn in corridor
• Fire equipment locations
• First aid points
• Outside final exits
Spacing Guidelines:
• Escape routes: Max 2× mounting height
• Open areas: Max 3× mounting height
• Dead ends: Within 2m of end
• External areas: Every 5m
Common Fitting Types:
• 3W LED: 200-300 lumens, £20-30
• 5W LED: 400-600 lumens, £30-50
• Twin spots: 300-400 lumens, £40-60
• Bulkheads: 400-800 lumens, £50-80

📦 Auto Materials Generator

Calculate materials needed for cable installations: uni-strut, cable ladder, tray, trunking, fixings, and more. Never forget items or over-order again!

Cable Support System

Typical: 1.5m for ladder, 1.2m for tray
Typical: 2 rods for standard, 4 for heavy loads
Ceiling to cable support height
Standard: 3m lengths

Additional Components

90° turns in the run
Typical: 10% for cuts & adjustments

💡 Pro Tips:
• Always add 10% waste for cuts and adjustments
• Account for end supports (start + finish)
• Heavy loads: reduce spacing to 1.2m or use 4 rods
• Uni-strut comes in 3m lengths - plan cuts wisely
• Don't forget fixings: washers, nuts, ceiling anchors

Quick Presets

Other Materials Needed

Fixings per Rod (Standard Method):
• M10 threaded rod (cut to length)
• M10 round washers: 3-4 per rod
• M10 square washers: 3 per rod (for uni-strut)
• M10 nuts: 2 per rod
• Ceiling anchors: 1 per support point
• Channel nuts: 1 per rod

Alternative (Faster):
• M10 flanged nuts: 2 per rod
• Skip round washers (flanged nut replaces them)
• Still need square washers for uni-strut
Joining Components:
• Uni-strut couplings for joins
• Ladder/tray couplers
• 90° bends (as calculated)
• Tee junctions (as calculated)
Safety & Finish:
• Earth bonding straps
• Warning labels
• Cable ties: 300-600mm spacing (typically 450mm)
• Velcro straps for easy access points
• Touch-up paint (if needed)

💰 Professional Quote Generator

Turn your calculations into professional customer quotes. Add materials, labour, and markup.

Job Details

🏢 Trade Account & Pricing

▼
💡 Most accurate: import your real price list (below). The discount % is a quick estimate off list; an imported CSV/Excel from your wholesaler uses your exact prices. Everything here now syncs to your account — set it once and it follows you to every device.
Not fetched — fetch in Pricing tab

Catalogue prices are trade estimates only — always confirm with your branch. Cable prices use your fetched Superlec/pricing tab data when available.

📥 Import price list

Download a price list or order history from your trade account website (CSV or Excel), upload it here, then map which columns contain the description and price.

Materials

📦 Add from catalogue
Materials subtotal £0.00

Labour & Costs

Travel, permits, hire, etc.

💡 Pro Tips:
• Typical markup: 15-25% for materials + labour
• Standard rate: £35-55/hour depending on region
• Always include contingency for variations
• Payment terms: 50% deposit, balance on completion

☀️ Solar PV System Designer

Complete solar system calculations: panel strings, DC cables, inverter sizing, AC export cables, and battery connections.

🔆 Panel & String Configuration

W
V
A
V
A
m
%/°C
°C

🔌 Inverter Specifications

V
V
V
W
m

🔋 Battery System (Optional)

🤖 AI Layout Optimizer

Automatically calculates optimal panel layout considering roof space, shading, orientation, and electrical constraints.

Upload a roof plan, aerial photo, or site drawing. The AI will overlay the panel layout on your image.
m
m
m
m
Standard panel: 1.7m × 1.1m
m
Minimum 0.5m for maintenance access
£ per kWp
Leave blank for UK average (£1,200/kWp). Typical range: £800-£1,500/kWp
Scan a board to fill the schedule

Job Management

📋 Installation Details

⚡ Particulars of Installation at the Origin

Section 10 — save once per site

👷 Your Details (saved permanently — fills signature blocks)

No profile saved — click Edit to add your details

📇 Client Book

Loading…

Moving from another certs app? Export your clients there and import them here — name, address, phone and email columns are detected automatically. Imported clients autocomplete on every quote, cert and invoice.

📋 Circuit schedule

Circuit details and test results in one editable schedule — edit any cell.

⚠️ AI-assisted — always check every value against the board. Scan results and quick-fills are a starting point. You are professionally responsible for the certificate you issue.
View:
No. Circuit designation WIRING CONDUCTORS mm² OVERCURRENT DEVICE Max Zs Ω RCD TEST RESULTS Result
Type Wiring Ref Pts L/N CPC Disc (s) BS EN Curve A kA RCD BS EN Type IΔn mA A r1 Ω rn Ω r2 Ω R1+R2 Ω IR MΩ Pol Zs Ω RCD ×1 RCD ×5 AFDD
Use 📷 AI Board Scan above to read a board, or ➕ Add a circuit manually

⚖️ 3-Phase Load Balancer

Enter your single-phase loads and the app will suggest the optimal allocation across L1, L2, and L3 to minimise phase imbalance.

➕ Add Loads

No loads added yet.

💡 Pricing from Superlec Direct

Get accurate cable costs based on Superlec Direct pricing. The calculator compares:
• 4-core SWA + separate earth vs 5-core SWA
• Different cable sizes in parallel
• Single large cable vs multiple smaller cables

☁️ Fetch Latest Prices

Get up-to-date Superlec prices from the cloud (updated monthly)

⚡ Quick Import

Copy cable prices from CEF, TLC, or your supplier's website and paste below. Format examples:
• "25mm² SWA 4 core £12.50"
• "50mm2 XLPE £28.99 per metre"
• "95mm SWA PVC - £45.20/m"

🏪 Superlec Cable Prices (£ per meter, ex VAT)

Fetch from cloud or enter manually:

💡 Tip: Prices are saved locally on your device. You only need to enter them once, then they'll be used for all future calculations!

📋 Common Cable Sizes (BS 7671)

1.0 mm²13A @ 30°C
1.5 mm²16A @ 30°C
2.5 mm²24A @ 30°C
4 mm²32A @ 30°C
6 mm²41A @ 30°C
10 mm²57A @ 30°C
16 mm²76A @ 30°C
25 mm²101A @ 30°C
35 mm²125A @ 30°C
50 mm²151A @ 30°C
70 mm²192A @ 30°C
95 mm²232A @ 30°C
120 mm²269A @ 30°C
185 mm²353A @ 30°C
240 mm²415A @ 30°C
300 mm²472A @ 30°C
400 mm²551A @ 30°C
500 mm²629A @ 30°C
630 mm²717A @ 30°C

⚡ Maximum Voltage Drop (BS 7671)

Lighting Circuits3% (6.9V @ 230V)
Other Circuits5% (11.5V @ 230V)
Three Phase5% (20V @ 400V)

🔥 Conductor Operating Temp

PVC Insulation70°C
XLPE Insulation90°C
Silicone Rubber180°C
PTFE/FEP200°C

🏠 Common UK Circuits

Lighting (6A MCB)1.0-1.5 mm²
Sockets (32A MCB)2.5-4 mm²
Cooker (32-40A MCB)6-10 mm²
Shower (40-50A MCB)10-16 mm²

🛡️ Max Zs Values (5s disconnection)

Type B 6A MCB7.67 Ω
Type B 32A MCB1.44 Ω
Type C 20A MCB1.15 Ω
Type C 32A MCB0.72 Ω

📏 Reference Methods

Method A/BEnclosed (CFs 0.5)
Method CClipped direct (CFs 0.94)
Method EFree air (CFs 1.0)
Method 101SWA clipped (CFs 0.9)
🔩 SWA Gland Sizes (Metric) tap to expand ▾

Match cable outer diameter (OD) to gland size. S = short barrel, L = long barrel.

Gland Cable OD (mm) Typical use
20S7.0 – 12.01.5–4mm² 2-core
20L10.5 – 14.54–6mm² 2-core
25S11.0 – 16.56–10mm² 2-core
25L14.0 – 18.510–16mm² 2-core
32S15.0 – 21.016–25mm² 2-core
32L18.5 – 24.525–35mm² 2-core
40S22.0 – 30.035–50mm² / smaller 3-core
40L27.0 – 35.050–70mm²
50S31.0 – 38.070–95mm²
50L35.5 – 44.095–120mm²
63S40.0 – 50.0120–150mm²
63L45.5 – 57.5150–185mm²
75S52.0 – 64.0185–240mm²
75L58.5 – 70.0240–300mm²

OD ranges are approximate and vary by manufacturer. Always measure your cable before ordering glands.

Help & Tour

Jump straight to any feature, or run the full tour from the start.

🤖
AI Board Scanning
Board Mate

Photo your consumer unit — AI reads every breaker: description, rating, curve type, cable size and RCD protection in seconds.

⚡
Test Results
IR, Polarity, RCD, Zs

Bulk-fill IR and polarity across all circuits in one tap. Values go green or red live as you type. Only R1+R2 and Zs need manual entry.

📋
Certificates
EIC · EICR · MWC · EV

Generate EIC, EICR, Minor Works and EV Charging certificates. All BS 7671 compliant, fully interactive, and print-ready as PDFs.

🪪
Board Passports
QR sticker for every board

Create a passport, print the QR sticker, fix it inside the CU. Anyone scanning it sees the full inspection history and your contact details.

📐
Cable Sizing
BS 7671 Appendix 4

Enter load, run length and voltage — get the correct cable size checking volt drop, CCC and fault current. Shows material cost per option.

💬
Quote Generator
With voice input

Build professional customer quotes with materials, labour and markup. Dictate the job description hands-free while still on site.

📖
BS 7671 Regs Lookup
Voice-powered

Say a reg number or describe a topic. The AI finds the relevant BS 7671 section and explains it in plain English instantly.

🔍
Fault Diagnosis
AI-powered

Describe a fault and get a structured diagnosis: likely causes ranked by probability, what to test first, and which regs apply.

☁️
Cloud Sync
All devices, offline-ready

Jobs, certs and settings sync automatically. Open on your phone, tablet or laptop — everything is there. Works offline too.

🛠️
More Tools
Load, invoices, teams

3-Phase load balancer, invoice tracker, lighting design, earthing calculator and team sharing.

Saved

No saved certificates yet

Generate a cert and hit Save to see it here

📡

App Monitor

Health status & recent client errors logged from real users

🏥 Health Check

Click "Run Check" to ping the health endpoint.

🐛 Recent Client Errors

Click "Refresh" to load errors.

Board Passports

QR sticker for every consumer unit — homeowners scan to see their inspection history

🪪
No passports yet
Create your first Board Passport to get a QR sticker for a property

Fault Diagnosis Assistant

Describe the symptoms — AI walks you through systematic testing until the fault is found

📋 Describe the fault

💡 Tips for best results
  • Describe exactly when it happens and any patterns
  • Mention the age of the installation if known
  • Note what equipment is on the affected circuit
  • Say what you've already checked

📖 Regulation Lookup

Ask any BS 7671 / 18th Edition question by voice or text

Try asking:
You're offline — changes saved locally, will sync when back online